Installation requirements of weighing system

Jan 05, 2025

Leave a message

The installation requirements of weighing system mainly include the following aspects:

1. Environmental requirements
Dry and ventilated: The floor scale should be installed in a dry and ventilated place to avoid damp environment causing the line to be damp and aging, which will affect the service life.
Level ground: The floor scale should be placed on a level ground to avoid unevenness causing inaccurate weighing and deformation of the bottom plate.
Temperature control: The weighing display controller should avoid direct sunlight and strong vibration, and the operating temperature should be kept between 10~35℃.


2. Equipment installation requirements
Rainproof function: The on-site equipment box should have rainproof function, avoid low-lying water accumulation, and ensure reliable sealing.
Grounding requirements: The input power must be properly grounded to ensure the safety of the equipment.
Handle with care: Handle with care during transportation or handling to avoid severe vibration and impact.


3. Installation requirements of industrial weighing modules
Flatness requirements: The flatness of the installation base of each weighing module should be within 0.3mm, and the bases of each module should be in the same horizontal plane.
Slowly lowering: When lowering the vessel to the module, proceed slowly to avoid damaging the module due to excessive impact.
Electric welding operation: When welding the module with electric welding, be careful to avoid damaging the sensor.


4. Cable tray installation requirements
Shielding electrical interference: The cable tray should select cable loops that need to shield electrical interference. Low-voltage power cables and control cables should be separated from trays or ladders.
Reliable grounding: The cable tray and its bracket must be reliably grounded and connected to the grounding trunk line at least 2 points along the entire length.
Bending radius: When laying the cable tray, the minimum bending radius of the cable must be considered to ensure that the installation of the support, hanger and bridge meets the specifications.

 

Send Inquiry

Get a free quote & product catalog

Tell us your needs-our engineers reply within 24 hours